Part O of the Building Regulations: Overheating Rules Explained

Bedroom window beneath an external shading overhang

Part O is the overheating requirement in the Building Regulations for England. It applies to new residential buildings and asks designers to limit solar gain in summer and to provide a way of removing excess heat. A new home passes either by following the simplified method’s design limits or by proving the result with dynamic thermal modelling. Which route is cheaper and safer depends on the glazing, the layout and the site, and it is best settled before the design is fixed.

Home Energy Model
Understand your home’s energy performance
Explore guidance on the Home Energy Model, energy efficiency assessments and what changing standards mean for property owners and professionals.

Visit

TL;DR

  • Part O (requirement O1) has applied in England since 15 June 2022 and covers new dwellings, residential institutions and other new residential buildings such as student accommodation.
  • It does not cover extensions to existing homes or changes of use, but a conservatory built as part of a new home is covered.
  • Compliance is shown by the simplified method (fixed limits on glazing, ventilation and shading) or by dynamic thermal modelling to the TM59 method.
  • Mechanical cooling is a last resort: passive measures must come first, and noise, security and safety limit how far windows can be assumed open.
  • Wales and Scotland run their own overheating rules, so check the document for the nation the building is in.

Table of Contents

What Part O is and why it exists

Part O is a section of Schedule 1 to the Building Regulations 2010. Requirement O1 calls for reasonable provision to limit unwanted solar gains in summer and to provide an adequate means of removing heat from the indoor environment. The purpose is to protect the health and welfare of occupants. It does not promise comfort on every hot day.

It was added by the Building Regulations etc. (Amendment) (England) Regulations 2021, which came into force on 15 June 2022. Better airtightness and insulation keep heat in during winter, but they also trap it in summer. Anyone looking at energy-efficient new builds will see the same trade-off: a tight, well-insulated home needs a plan for shedding heat.

The problem is measurable. A 2019 government-commissioned study, cited in a UK Collaborative Centre for Housing Evidence policy brief, found that none of eight modelled housing types met acceptable overheating criteria. London homes exceeded the criteria by up to 600%. The same brief reports 2018 research in which 19% of bedrooms (4.6 million) and 15% of living rooms (3.6 million) overheated. It also notes that overheating falls hardest on social housing and on low-income and older households.

Reported overheating rates in bedrooms and living rooms

Where Part O applies

Part O applies to new residential buildings only. Approved Document O lists three groups:

  • dwellings, meaning houses and flats;
  • institutional buildings where people sleep, such as care homes;
  • other residential buildings, such as halls of residence and student accommodation.

Shared communal rooms and common spaces in multi-unit buildings are in scope too.

Extensions, conservatories and change of use

The government’s Approved Document O FAQs say Part O does not apply to extensions or conservatories added to a residential building after it is built, or to buildings undergoing a change of use. A conservatory that forms part of a new residential building must meet Part O. A landlord converting an office to flats is therefore outside Part O today, though other energy and ventilation requirements still apply.

Mixed-use and live/work buildings

In a mixed-use building, Part O covers the residential parts and any corridor serving residential units. A live/work unit counts as residential if the commercial part could revert to residential use: direct access, the same thermal envelope and a substantial residential share. The approved document sets these tests out.

Which nation’s rules

The 2021 amendments apply to buildings and building work in England, as the circular letter to building control bodies confirms. Wales has its own Approved Document O, and the Welsh Government’s 2025 consultation version proposes its own simplified approaches. Scotland applies Standard 3.28 on overheating risk, which the Climate Change Committee’s 2026 report discusses alongside Part O. A scheme in Cardiff or Edinburgh should not be designed to the English limits without checking.

Two routes to compliance

The approved document allows two ways to show that requirement O1 is met: the simplified method (Section 1) and dynamic thermal modelling (Section 2). Mechanical cooling may be used only where insufficient heat can be removed without it.

Simplified method Dynamic thermal modelling
What it is Fixed design limits on glazing, free ventilation area and shading A simulation of the specific building against a weather file and criteria
Best for Regular houses and flats with moderate glazing Large glazing, vaulted spaces, awkward orientation, complex or large schemes
Main risk Limits can force the design to change late Needs correct inputs and an experienced modeller
Output A table check against the limits A report showing pass or fail for each room

The simplified method in practice

The simplified method sorts each building by location and each home by ventilation.

  1. Location risk. England is split into moderate risk and high risk. High risk covers urban and some suburban parts of London listed in Appendix C, with some guidance for central Manchester areas. Everywhere else is moderate.
  2. Cross-ventilation. Each unit is classed separately by whether it has openings on opposite façades. A through-flat can use more glazing than a single-aspect flat.
  3. Limits. The document then caps glazing as a proportion of floor area, sets minimum free ventilation areas and allows shading to relax the limits.

In a Homebuilding explainer, Mark Stevenson notes that whole-building glazing can be restricted from 18% down to as low as 11%, depending on location, orientation and cross-ventilation. He also notes that the method is really a set of design limits suited to basic house designs.

Worked example. A single-aspect flat in a high-risk London postcode has no cross-ventilation and the most restrictive limits. The same floor plan in a moderate-risk area, or reworked with openings on two façades, can carry more glass. The architect should classify every unit before the façade is drawn, not after.

Dynamic thermal modelling

Dynamic thermal modelling simulates hourly temperatures in each room. The approved document points to the CIBSE TM59 method for homes. It suits schemes where the simplified limits would remove too much glazing, or where the design is too complex for a table. The same modelling skills are used for non-domestic checks under TM52. Our guides to TM59 compliance for residential buildings and overheating assessment for UK properties cover the criteria in more detail. For other buildings, see addressing overheating with TM52.

The government’s own consultation response records a weakness. Housebuilders reported inconsistent overheating results between assessors and modelling software. Suggested fixes included aligning with updated TM59, reporting design assumptions and a competency scheme for assessors. The practical lesson is to write down every assumption, so building control can follow the model.

Design measures that decide the result

Glazing, shading and orientation

Solar gain through glass is the largest lever. Cutting glazing on south and west façades, using external shutters or overhangs and specifying glass with a lower g-value (the share of solar heat that passes through) all reduce the load. The Welsh consultation draft, for example, proposes single-aspect options of 15% glazing with 12% minimum free area, or 20% glazing with a g-value of 0.4 or less and 10% free area. Treat these as a sign of the type of limit involved, not as English requirements.

Ventilation and openable area

Heat leaves through openings, so free area (the actual unobstructed opening) matters more than window size. Cross-ventilation helps most. Background and mechanical ventilation also form part of the picture, and our guide to home ventilation solutions explains the options for UK homes.

Noise, security and safety

Requirement O1(2)(a) means the strategy must account for noise at night, pollution, security, protection from falling and protection from entrapment. In Table 3.1 and Section 3, openings wider than 100mm only count if handles sit no more than 650mm from the wall and guarding meets the table. A ground-floor bedroom window that a resident would not leave open overnight cannot be assumed open in the model. Stevenson argues this is sensible because it ties the calculation to how the building is lived in.

Noise, security and safety

Mechanical cooling as a last resort

If cooling is needed to pass, the FAQs say SAP calculations must show that mechanical cooling is installed. It must also be demonstrated that all practicable passive means were used first, for instance by meeting the simplified method’s limits or designing to pass without cooling. Passive-first design also cuts running energy and improves resilience, a point made in professional technical guidance on Part O. For a SAP route, see our page on SAP calculations in England.

What building control needs to see

Building control wants evidence that the chosen route has been followed, and the form depends on the route.

  • Simplified method: a clear schedule per unit showing location risk, cross-ventilation status, glazing areas, free areas and any shading, plus drawings that match.
  • Dynamic modelling: the TM59 report, the weather file, the occupancy and gain assumptions, the ventilation assumptions that follow the O1(2)(a) tests and the results by room.
  • Cooling: the SAP evidence and the passive-first justification.

After completion, Regulation 40B requires the person doing the work to give the owner enough information about the overheating provision within five days, so the home can be operated to protect against overheating. Developers should build this into the handover pack.

Transitional arrangements

The 2021 edition took effect on 15 June 2022. It does not apply to work with a building notice, full plans application or initial notice submitted before that date, provided work on each building started before 15 June 2023, as the approved document explains. That window has closed, so any scheme now starting is under Part O.

What may change next

In March 2026, the government’s consultation response said it would carry out a full technical review of Approved Document O. The Climate Change Committee’s 2026 report also notes that extending the rules to material change of use is under discussion and that large-scale monitoring of occupied homes could build the evidence base. Designers should expect tighter detail and closer alignment with SAP and the Home Energy Model, and check GOV.UK for the current edition before submitting.

Landlords, investors and existing stock

Part O itself bites on new build, but the problem it targets sits in existing homes too. Landlords converting or refurbishing should look at shading, ventilation and glazing as part of wider upgrades. Our guides to proven upgrades for older homes and the building envelope rules for landlords show where to start. Part O sits alongside the wider energy rules covered in our UK building regulations energy guide.

Getting the assessment done

The cheapest time to deal with Part O is at concept stage, when glazing ratios and layouts can still move. We offer Dynamic Simulation Modelling and Standard Assessment Procedure calculations for new homes, and Energy Statements for Planning where a planning application needs one. A quote request through the site takes the project details and puts the assessment in motion.

Home Energy Model

For a scheme with large glazing or a high-risk location, request a quote for dynamic modelling before the façade design is frozen. For a conventional house, send the plans for a SAP calculation and have the Part O schedule prepared alongside it.

Our view

Part O is easy to underestimate because it arrives late in the process. Teams finish the façade, then discover that a glazed corner or a single-aspect flat fails.

We think the sensible order is to classify each unit first, then choose between the simplified method and a model. The simplified method suits straightforward designs. Modelling gives room to keep ambitious glazing, as long as the assumptions are recorded and stand up to building control.

Overheating, SAP and the coming Home Energy Model are linked. A design that is cooler passively needs less cooling energy, and that shows up in the energy calculation. Handling them together saves repeated rework.

Danny

FAQ

Does Part O apply to extensions?

No. Part O does not apply to extensions or conservatories added to a home after it is built, or to changes of use. A conservatory that is part of a new residential building must comply. Other Building Regulations still apply to the extension.

Is Part O the same in Wales and Scotland?

No. The 2021 amendments apply to England. Wales has its own Approved Document O, with a revised version consulted on in 2025, and Scotland applies Standard 3.28. Check the document for the nation where the building stands.

Can I install air conditioning instead of designing for passive cooling?

Only where insufficient heat can be removed without it. You must show that practicable passive measures were included first, and the SAP calculation must record the cooling system. Air conditioning installed in larger systems may also need a TM44 inspection.

Which method should a new home use, simplified or modelling?

The simplified method suits regular designs with moderate glazing. Dynamic thermal modelling is better for large glazed areas, vaulted spaces, unfavourable orientation or high-risk London locations. Classify each unit by location and cross-ventilation to see which route is realistic.

What must be handed to the owner?

Regulation 40B requires the person carrying out the work to give the owner sufficient information about the overheating provision within five days of completion. This lets the occupier operate openings, shading and ventilation properly.